Stakeholder Consultation Questionnaire

    1. Respondent Profile

    1.1 Type of organization (Multiple choice):


    1.2 Country of operation (Multiple choice):

    1.3 Level of involvement in CST technologies (Linear scale: 1 = very limited, 5 = very high):

    1.4 What is the country of origin of your company?

    2. Status of the CST Sector

    2.1 How do you assess the technological maturity of CST technologies in Europe (a) Linear scale: 1 = very limited, 5 = very high)

    2.2 Which are the main barriers to large-scale deployment: select up to three choices


    2.3 Applications with the highest potential for CST technologies (select up to three):


    3. Research and Innovation Priorities

    3.1 CST technologies to prioritize in future research and innovation programmes (Multiple choice – select up to 3):


    In what timeframe do you expect major improvements?
    In the first column insert the name of the technology selected in the previous question.

    Technology number_:


    Technology number_:


    Technology number_:


    3.2 Which components most limit CST efficiency (Multiple choice – select up to 3)?

    3.3 What are the key technological challenges that must be addressed to enhance efficiency and reduce the costs of CST systems? Please rate the importance of the following challenges: (Linear scale: 1 = very limited, 5 = very high):

    Reducing maintenance costs (OPEX):

    Improving thermal efficiency, process efficiency:

    Reducing capital costs (CAPEX):

    Reducing financial and administrative costs (loan interest rates, insurance rates, authorizations…):

    Enhancing energy storage systems:

    Improving heat transfer fluids:

    Increasing durability of materials:

    Scaling up from demonstrator to commercial scale:

    Other (specify):

    4. Cost Drivers in CST Systems

    If you have limited experience with CST technology costs, or if you prefer a shorter response, you can choose to answer only Q4.7 (simplified question).
    Alternatively, you may complete questions Q4.1–Q4.6 to provide more detailed input.

    4.1 To what extent do the following factors contribute to the overall costs of CST systems? (1 = very limited, 5 = very high):

    Material costs (mirrors, receivers, structures)

    Installation and construction costs

    Operation and maintenance (O&M) costs

    System efficiency and energy losses

    Thermal energy storage technologies

    Financing costs (CAPEX, WACC)

    Regulations and permitting

    Geographic location

    4.2 Rank the TOP THREE factors in terms of their impact on CST costs (1 = most relevant)



    4.3 Distribute 100 points across the following factors based on their contribution to CST costs

    Material costs (mirrors, receivers, structures)

    Installation and construction costs

    Operation and maintenance (O&M) costs

    System efficiency and energy losses

    Thermal energy storage technologies

    Financing costs (CAPEX, WACC)

    Regulations and permitting

    Geographic location

    4.4 Which factors will have the greatest impact on REDUCING CST costs over the next 10 years? (1 = very limited, 5 = very high):

    Material costs (mirrors, receivers, structures)

    Installation and construction costs

    Operation and maintenance (O&M) costs

    System efficiency and energy losses

    Thermal energy storage technologies

    Financing costs (CAPEX, WACC)

    Regulations and permitting

    Geographic location

    Technological innovation

    Digitalization

    4.5 What is currently the main cost driver in CST systems? (Type: Single choice)

    4.6 Are there any additional factors or considerations regarding CST costs that you find relevant?

    4.7 (Only for respondents without prior experience in CST/CSP technologies)

    In your opinion, to what extent do the following factors influence the costs of concentrated solar thermal energy? (1 = very limited, 5 = very high)

    Cost of main materials

    Plant construction costs

    Operation and maintenance costs

    System efficiency (how much energy is produced)

    Energy storage systems

    Financial costs (investments, loans)

    Rules and permits

    Location of the plant

    5. Energy System Integration

    5.1 Importance of integration with other energetic systems for heat production (1 = very limited, 5 = very high):

    5.2 Role in smart grids (max 3)


    6. Policy and Market Development to support CST

    6.1 Policy instruments that could best support CST development in Europe (Multiple choice – select up to 3):


    6.2 In your opinion, how important is it to strengthen collaboration between industry, research, and European institutions in the development of CST technologies? (1 = very limited, 5 = very high):

    6.3 Which actions are most needed in the next decade to accelerate the deployment of CST technologies? Please rate the importance of the following challenges: (select up to 3):


    6.4 Which are the regulations or the policies important to support the deployment of CST/CSP technologies in Europe.

    6.5 Which policy strategy for cost reduction do you consider most promising?

    7. Long-term Vision

    7.1 Expected role of CST technologies worldwide by 2040:


    Please, explain the answer:

    7.2 Expected role of CST technologies worldwide by 2050:


    Please, explain the answer:

    8. Others

    8.1 Additional recommendations for the European Strategic Research and Innovation Agenda (SRIA) for CST:

    Your information will be securely sent to and stored in Google Sheets for the purpose of processing your form submission.